• Consultation Materials

Preliminary Environmental Information Report

Technical Appendices

 

Contents page – PEIR Volume 3 – Technical Appendices >

Introduction

Appendix 1.1 Section 35 Direction >

Appendix 1.2 Legislation, Policy and Guidance >

Appendix 1.3 Glossary >

 

Description of Proposed Development

Appendix 3.1 Qualitative Description of the Marine Cable Corridor >

Appendix 3.2 Marine Worst-Case Scenarios >

 

Consultation

Appendix 5.1 EIA Scoping Report >

Appendix 5.2 EIA Scoping Opinon >

Appendix 5.3 Responses to PINS EIA Scoping Opinion >

Appendix 5.4 Screening for Major Accidents and Disasters >

 

Physical Processes

Appendix 6.1 Physical Processes Cumulative Assessment Matrix >

 

Marine Water and Sediment Quality

Appendix 7.1 Marine Water Framework Directive Assessment >

Appendix 7.2 Marine Water and Sediment Quality Cumulative Assessment >

Appendix 7.3 Contaminated Sediment Survey Report >

 

Intertidal and Benthic Ecology

Appendix 8.1 Benthic Ecology Survey Report >

Appendix 8.2 Intertidal Survey Report >

Appendix 8.3 Intertidal and Benthic Ecology Cumulative Assessment >

 

Fish and Shellfish

Appendix 9.1 Fish and Shellfish Cumulative Assessment Matrix >

 

Marine Mammals and Basking Sharks

Appendix 10.1 Marine Mammals and Basking Sharks Cumulative Assessment Matrix >

 

Marine Ornithology

Appendix 11.1 Marine Ornithology Cumulative Assessment Matrix >

 

Commercial Fisheries

Appendix 12.1 Commercial Fisheries Baseline Report >

Appendix 12.2 Commercial Fisheries Cumulative Assessment Matrix >

 

Shipping, Navigation and Other Marine Users

Appendix 13.1 Navigation Risk Assessment >

Appendix 13.2 Shipping, Navigation and Other Marine Users Cumulative Assess Matrix >

 

Marine Archaeology 

Appendix 14.1 Marine Archaeology Technical Report >

Appendix 14.2 Marine Archaeology Cumulative Assessment Matrix >

 

Landscape and Visual Amenity

Appendix 15.1 Detailed Methodology >

Appendix 15.2 Summary of the Consultation undertaken for the LVIA to date >

 

Onshore Ecology

Appendix 16.1 Preliminary Arboricultural Report >

Appendix 16.2 Summary of Ecological Receptors >

 

Soils and Agricultural Land Use

Appendix 17.1 Detailed Agricultural Land Classification Survey >

Appendix 17.2 Agricultural Land Classification Report (ADAS on behalf of MAFF’s, 199 >

 

Water Resource and Flood Risk

Appendix 19.1 Baseline Data >

 

Heritage and Archaeology

Appendix 20.1 Heritage and Archaeological Baseline >

Appendix 20.2 Heritage and Archaeological Impact Tables >

Appendix 20.3 Heritage and Archaeological Residual Effects Tables >

 

Traffic and Transport

Appendix 21.1 Baseline and Methodology Tables >

Appendix 21.2 Impact Tables >

 

Air Quality

Appendix 22.1 Relevant UK Air Quality Strategy Objectives >

Appendix 22.2 IAQM Construction Assessment Methodology >

Appendix 22.3 Indicative Criteria for Requiring an Air Quality>

Assessment Appendix 22.4 Wind Rose for Thorney Island, 2015 >

Appendix 22.5 Scoping Opinion Responses (Local Planning Authorities, pre-DCO) >

 

Noise and Vibration

Appendix 23.1 Legislation, Policy and Guidance >

Appendix 23.2 Survey Equipment >

Appendix 23.3 Survey Meteorological Conditions >

Appendix 23.4 Survey Results >

 

Socio-Economics

Appendix 24.1 Businesses within 500m >

Appendix 24.2 Community Resources within 500m >

 

Carbon and Climate Change

Appendix 27.1 Climate Change Resilience >

 

Cumulative Effects

Appendix 28.1 Long List of Onshore Committed Developments >

Appendix 28.2 Short List of Onshore Committed Developments >

 

Main Text >

Figures >